Showing posts with label Project01. Show all posts
Showing posts with label Project01. Show all posts

Midterm Review of Selected Project01

Daniel E Gunawan's Project01 - Art Salon

According to the individual analysis on the region, kemang has transformed into a region that not only a place of expat's residentials but also a place that emerged small creative industry including furniture studio, crafting and product design showroom.
The mentioned statement leads the student -daniel e gunawan- to establish a hospitality facility that accomodate artist community activities in kemang region. The program combines temporarily gallery, cafe and workshop into hub for artists which expected to intensify their art activities and event.










Rinaldy Santoso's Project01 - Executive Club

The program proposed by the student -rinaldy santoso- try to bridge business activities that occured along jalan kemang raya and jalan antasari, by locating a new hospitality facilities for executives class in between those area.
The program combines medium convention hall and temporary lodging for executives.








Some critisms for the student's design:
  • There are some lacks of explanation about how the design enrich the existing urban space which has to be applies at every scale, including the region, city, neighbourhood and the street.
  • Lack of connections seems occured in the design, which showed through inadequate of integration of physical and visual designed space on the site to its surounding.
  • The architectural design is too much focusing on the building -massing, ignoring the space created within the masses or surrounding the masses.

Progress Review - Week07

The following pages show some comments of the selected works of week07. The comments written in indonesian.


Project 01 | August-October 2010

The first assignment of the studio/Project01 is to develop a hospitality program in Kemang area, Southern Jakarta. The students will have to choose site (5000-8000 sqm) in order to develop his/her proposed hospitality program.

Some constraints to be considered: BCR @50-60%, FAR @ 2 and maximum 4 storey (excluding 1 storey of basement).
The program should be consisted of several masses (2 masses as minimum).
View Larger Map
The submission of the first assignment of the studio/Project01 will be held on Monday, October 4, 2010 at 12.oo. And the Midterm presentation will be held on Wednesday, October 6, 2010 at 10.00.